SITC and O and M of CCMS for Street Lighting on (i) Amd-Vad NH48 (L 102.300 km) (ii) Amd-Vad EW NE01 (L 93.302 km) (iii) Motachiloda-Nanachiloda NH48 (L 15.310 km) (iv) Shamlaji-Motachiloda NH48 (L 93.210 km) of under PIU Amd on 5 yr Contract Basis
National Highways Authority of India
Gujarat
27 days left
Not specified
29 Jun 2026
Strengthening and overlay on various stretches of Gozaria to Prantij Section from km 558.200 to km 595.585 of NH-68 in the state of Gujarat on item rate (percentage) basis
National Highways Authority of India
Gujarat
10 days left
₹21.2Cr
12 Jun 2026
Operation and Maintenance of Eight Lane Vadodara Kim Expressway from km 323.00 to km 355.00 (Sanpa to Padra Section of Vadodara Mumbai Expressway) in the state of Gujarat
IRCON International Limited
Gujarat
10 days left
Not specified
12 Jun 2026
Strengthening and Overlay on damaged sections of Six lane Ahmedabad to Vadodara Section of NH 48 (Old NH-8) from Km. 6.400 to Km. 108.700 (Length 102.300 Km) in the State of Gujarat at Risk and Cost of Concessionaire on Single Percentage Item Rate Ba
National Highways Authority of India
Gujarat
13 days left
₹130Cr
15 Jun 2026
Strengthening and overlay at various stretches of 6-lane access-controlled Greenfield Highway from km 99.000 to km 130.073 of Rajasthan Gujarat Border to Santalpur section of NH-754K in Gujarat on EPC mode at Risk and Cost of existing Contractor
National Highways Authority of India
Gujarat
6 days left
₹57.7Cr
08 Jun 2026
Upgradation to 6 lane with paved shoulder of NH 141 from km 5.560 to 14.014 excluding the ROB section from km 05.885 to km 06.870 and Interchange location from km 09.795 to 11.735 and construction of new 6 lane Major bridge of Nakti Creek at km 7.1